BioMaxis Implementation Guide
0.0.0-semantic-release - ci-build

BioMaxis Implementation Guide - Local Development build (v0.0.0-semantic-release) built by the FHIR (HL7® FHIR® Standard) Build Tools. See the Directory of published versions

ValueSet: Inventory Operation Reason

Official URL: http://biomaxis.com/fhir/ValueSet/inventory-operation-reason Version: 0.0.0-semantic-release
Draft as of 2026-02-04 Computable Name: InventoryOperationReason

A comprehensive value set to represent reasons for all inventory operations including transfers, disposals, and other inventory-related activities.

References

Logical Definition (CLD)

 

Expansion

Expansion performed internally based on codesystem Inventory Operation Reason v0.0.0-semantic-release (CodeSystem)

This value set contains 16 concepts

SystemCodeDisplay (en)DefinitionJSONXML
http://biomaxis.com/fhir/CodeSystem/inventory-operation-reason  nearing-expiryNearing ExpiryItems are being transferred because they are approaching their expiration date and can be used more effectively at the destination location.
http://biomaxis.com/fhir/CodeSystem/inventory-operation-reason  stock-balancingStock BalancingItems are being transferred to balance inventory levels across multiple locations and optimize stock distribution.
http://biomaxis.com/fhir/CodeSystem/inventory-operation-reason  request-fulfillmentRequest FulfillmentItems are being transferred to fulfill a specific transfer request from another location or facility.
http://biomaxis.com/fhir/CodeSystem/inventory-operation-reason  increased-demandIncreased DemandItems are being transferred to meet increased demand at the destination location.
http://biomaxis.com/fhir/CodeSystem/inventory-operation-reason  for-disposalFor DisposalItems are being transferred to a location designated for disposal due to damage, expiry, or other reasons making them unsuitable for use.
http://biomaxis.com/fhir/CodeSystem/inventory-operation-reason  correction-of-deliveryCorrection of DeliveryItems are being transferred to correct an error in a previous delivery or allocation.
http://biomaxis.com/fhir/CodeSystem/inventory-operation-reason  temporary-relocationTemporary RelocationItems are being temporarily relocated for reasons such as facility maintenance, renovation, or temporary storage needs.
http://biomaxis.com/fhir/CodeSystem/inventory-operation-reason  for-specific-procedureFor Specific ProcedureItems are being transferred specifically for use in a planned procedure or treatment.
http://biomaxis.com/fhir/CodeSystem/inventory-operation-reason  recalledRecalledItems are being recalled due to a manufacturer or regulatory recall notice.
http://biomaxis.com/fhir/CodeSystem/inventory-operation-reason  expiredExpiredItems are being disposed of because they have passed their expiration date and are no longer safe or effective for use.
http://biomaxis.com/fhir/CodeSystem/inventory-operation-reason  damagedDamagedItems are being disposed of due to physical damage that makes them unsuitable or unsafe for use.
http://biomaxis.com/fhir/CodeSystem/inventory-operation-reason  contaminatedContaminatedItems are being disposed of because they have been contaminated and pose a risk of infection or harm.
http://biomaxis.com/fhir/CodeSystem/inventory-operation-reason  defectiveDefectiveItems are being disposed of because they are defective or do not meet quality standards.
http://biomaxis.com/fhir/CodeSystem/inventory-operation-reason  obsoleteObsoleteItems are being disposed of because they are obsolete, superseded by newer versions, or no longer clinically relevant.
http://biomaxis.com/fhir/CodeSystem/inventory-operation-reason  patient-specific-unusedPatient-Specific UnusedItems that were prepared or allocated for a specific patient but were not used and cannot be returned to general stock.
http://biomaxis.com/fhir/CodeSystem/inventory-operation-reason  storage-failureStorage FailureItems are being disposed of due to improper storage conditions such as temperature excursions or environmental exposure.

Explanation of the columns that may appear on this page:

Level A few code lists that FHIR defines are hierarchical - each code is assigned a level. In this scheme, some codes are under other codes, and imply that the code they are under also applies
System The source of the definition of the code (when the value set draws in codes defined elsewhere)
Code The code (used as the code in the resource instance)
Display The display (used in the display element of a Coding). If there is no display, implementers should not simply display the code, but map the concept into their application
Definition An explanation of the meaning of the concept
Comments Additional notes about how to use the code